Veit was hired to complete various underwater concrete repairs and install a custom cofferdam that was 42 feet in depth. Prior to installation, Veit needed to remove sediment and debris to reach bedrock. A dive station was set up on a 40 x 60-foot barge spread with an 80-ton crane for material handling. Once installed, we assisted in sealing the cofferdam for dewatering so the General Contractor could get in and reconstruct one of the structured dividing walls. Once the wall was reconstructed, Veit assisted in removing the cofferdam.