We were contracted with Ryan Companies to complete site preparation for a 2.4 million square foot, 4-story distribution center for Amazon. The earthwork portion of the project included excavation and backfill for the building, and construction of all parking lots, roadways, and service drives.
Utility work on the site included the construction of stormwater retention ponds to capture and manage runoff; and sanitary, sewer, and public water main.
The excavation and work Veit performed included clearing and grubbing, cut-and-fill, site stabilization, and fire protection. In addition, Veit constructed stormwater ponds to catch water runoff.