Project Overview

Veit contracted with Adolfson & Peterson to perform earthwork, utilities, demolition, driven piling, and earth retention for a new apartment building and parking ramp in Minneapolis, MN. The site will soon host a new parking ramp and two residential buildings, one 6-story apartment and one 7-story apartment.

Veit’s responsibilities include demolition of an existing parking ramp, erosion control, site grading, footing/wallexcavation/backfill,vapor system installation, andcontaminated soil remediation. Other work includes laying sandcushions for buildings,constructing a base for sidewalks and pavements, drivenpiling,and earth retention. 540steel piles were driven for the new parking ramp and building B. Utility work includes storm sewer, storm systems,water lines, and sanitary sewer installation.

Phase II work will begin 2022.

Market
Commercial
Owner
Adolfson & Peterson
Type of Project
Earthwork, Foundation, Utility
Project Scope
Foundation, Earthwork, and Utility
Duration
January 2021 – December 2021

Challenges We Solved

01.
Inclement Weather
We worked through the winter months to meet the aggressive construction schedule.
02.
Contaminated Soils
The site had mercury and petroleum soils that were disposed of in-state as well as hazardous PCB soils that were hauled to Michigan
03.
Tight Site Area
We managed to work in a tight area which included our multiple scopes of work, the general contractor pouring concrete, and the Southwest Light Rail construction happening directly adjacent to our site.