The Southwest Green Line Extension was the largest public infrastructure project in Minnesota history, extending the METRO Green Line approximately 14.5 miles from downtown Minneapolis to Eden Prairie. The project included 16 new stations, numerous bridges, tunnels, retaining walls, freight rail relocation, and extensive utility reconstruction to expand regional public transportation throughout
Hennepin County.
Veit performed specialized foundation construction and commercial diving services as a subcontractor to the Lunda Construction/C.S. McCrossan Joint Venture. Foundation work included the installation of drilled piers, auger cast piles, and strand anchors, compaction & permeation grouting, helicals supporting transit structures throughout the corridor.
Veit’s commercial diving team provided underwater inspection and repair services during tunnel and excavation construction, inspecting sheet pile walls for water infiltration, identifying gaps, and completing underwater repairs as necessary to maintain excavation integrity and support subsequent tremie concrete placements.