Veit was hired to do the excavation work for NAC Mechanical in order to install a critical condensate line for the 3M Center Building 275.
Our crews performed all site removals and provided safe excavation for NAC Mechanical to install a new condensate mechanical pipe. Once the pipe was installed, we backfilled the excavation and were in charge of all the subcontractors involved in restoring the site to its existing condition.
We used a 325 Cat Excavator and a 239 Cat Track Loader to complete the project.